Airport Construction
McCarran Airport
Terminal 3 Baggage Conveyor
- Installation of 165 motor control panels including feeders
- Installation of 1,600 drives with associated control devices
- Installation of baggage handling system computers and all interfaces with BMS, MUFIDS, EDS, fire detection, etc.
- Installation of two independent control rooms in separate terminals
- Installation of all baggage handling system displays
- Installation of Allen Bradley control net system
- Installation of RF readers/writers for bag tracking and security status
- Installation of explosive detection systems
- Installation of 16 curbside systems
- Installation of required fire and security doors at conveyor openings including interfaces
- Complete engineering services including 3D coordination