McCarran Airport

Terminal 3 Baggage Conveyor

  • Installation of 165 motor control panels including feeders
  • Installation of 1,600 drives with associated control devices
  • Installation of baggage handling system computers and all interfaces with BMS, MUFIDS, EDS, fire detection, etc.
  • Installation of two independent control rooms in separate terminals
  • Installation of all baggage handling system displays
  • Installation of Allen Bradley control net system
  • Installation of RF readers/writers for bag tracking and security status
  • Installation of explosive detection systems
  • Installation of 16 curbside systems
  • Installation of required fire and security doors at conveyor openings including interfaces
  • Complete engineering services including 3D coordination

 